Bridge builder
Suitable for bridge pier, shear wall core engineering construction and protection.
5. The concrete of the bridge pier can be insulated and steam cured during construction and maintenance.
|
No. |
Item |
Unit |
parameter |
|
1 |
Beret platform rating |
T |
200 |
|
2 |
Lifting speed |
M/MIN |
60 |
|
3 |
Scope of construction |
M |
40-500 |
|
4 |
Rated thrust of hydraulic cylinder |
KN |
700 |
|
5 |
Top protection |
M |
1.8 |
|
6 |
Retractable electric canopy |
M |
2.2 |
|
7 |
Protective height of hanger |
M |
16-17.5 |
Next:No!